Methodstatementhq
A place for sharing the safe working method statements project documents, plans templates and working instructions.
We provide customized documentations for any kind of project. Including preparation of operation and maintenance manuals.
07/10/2026
Air Curtain Unit Preventive Maintenance & Troubleshooting
The purpose of this section is to provide guidance in preventive maintenance and basic fault tracing and provide instructions for corrective actions to remedy any faults. Go through this section, Fault tracing before contacting suppliers. To ensure the air curtain operates at full efficiency the inlet/outlet grilles, fan impellers, housings and motors must be kept free of dust and debris. Build up of dust on the fan impellers can cause vibration, noise and excessive wear on the motor bearings....
Air Curtain Unit Preventive Maintenance & Troubleshooting The purpose of this section is to provide guidance in preventive maintenance and basic fault tracing and provide instructions for corrective actions to remedy any faults. Go through this section, F…
06/10/2026
Schneider Electric LV Switchgear Panels Features
Main Distribution Boards MDB - BLOCKSET The low voltage main distribution boards are Schneider Electric “BLOKSET” range of L.V Switchboards. Blokset switchboards are designed, manufactured and tested in accordance with IEC 60439-1 standards. BLOKSET, a modular multi - functional system has been designed to improve reliability and safety which: Complies with International Standards Tested according to International standards Manufactured in ISO certified facilities…...
Schneider Electric LV Switchgear Panels Features Main Distribution Boards MDB – BLOCKSET The low voltage main distribution boards are Schneider Electric “BLOKSET” range of L.V Switchboards. Blokset switchboards are designed, manufactured an…
05/10/2026
LPG Piping System Installation Method Statement
Below is a brief method statement for installation & testing of Liquefied Petroleum Gas LPG Piping System including the tank. LPG System shall be installed & tested by specialist supplier approved for the project. Ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the installation, refer to the approved shop drawings related to the area of installation and ensure that required materials are available at site as per approved material submittals....
LPG Piping System Installation Method Statement - Project Management 123 Below is a brief method statement for installation & testing of Liquefied Petroleum Gas LPG Piping System including the tank. LPG System shall be installed & tested by specialist supplier a…
04/10/2026
No pen no paper just answer
30/09/2026
GRP Sectional Water Tank Installation Method Statement
Below is the step wise procedure for the installation of GRP Sectional Domestic Water Tanks. Installation team shall ensure all civil works are completed for the area of installation, and clearance is obtained from respective authorities to proceed further. Prior to start the grp water tank installation, refer to the approved shop drawings related to the area of installation and ensure that required materials are available at site as per approved material submittals....
GRP Sectional Water Tank Installation Method Statement - Project Management 123 Below is the step wise procedure for the installation of GRP Sectional Domestic Water Tanks. Installation team shall ensure all civil works are completed for the area of installation, and clearance…
29/09/2026
Fire Sprinkler System and Accessories Installation Method Statement
This method statement describes the procedure for the installation of fire protection services on a project. The work methodology covers following activities: Pipe Hanger Installation Flanged Fittings Installation Valve with Screw Connection Installation Valve with Flanged End Connection Installation Flow Switch Installation Screw Fittings Installation Sprinkler Head (with ceiling) Installation Sprinkler Head (without ceiling) Installation Pipe Sleeve Installation Fire Protection Riser Pipe Installation…...
Fire Sprinkler System and Accessories Installation Method Statement - Construction Method Statement This method statement describes the procedure for the installation of fire protection services on a project. The work methodology covers following activities: Pipe Hanger Installation Flanged Fitti…
28/09/2026
Underground Drainage Piping Method Statement
This plumbing method statement covers the installation of Sanitary, Vent and Storm drainage piping installation. By following and implementing this procedure contractor shall ensure that drainage and vent piping have been installed as per the contract requirements and project specifications. Required Materials PVC Pipe & Fittings Ductile Pipe & Fittings Cast Iron Pipe & Fittings Polyethylene Pipe and Fittings Polyethylene Film for Ductile & Cast Iron Pipes…...
Underground Drainage Piping Method Statement This plumbing method statement covers the installation of Sanitary, Vent and Storm drainage piping installation. By following and implementing this procedure contractor shall ensure that drainage a…
28/09/2026
Refrigerant Gas Leakage Detection and Charging Method
The purpose of this AC repair method is to establish a standard procedure for identifying gas leaks on air conditioning and refrigeration system thus preventing release of refrigerant gas in the atmosphere. This method will also serve as guideline for new and old employees for performing the ac maintenance activity. The scope of this standard covers all maintenance activities for A/C and refrigeration equipments....
Refrigerant Gas Leakage Detection and Charging Method The purpose of this AC repair method is to establish a standard procedure for identifying gas leaks on air conditioning and refrigeration system thus preventing release of refrigerant gas in the at…
27/09/2026
SMDB, MDB, FDB LV Switchgear Panels & Distribution Board Construction & Specifications
The switchboards, distribution boards including smbd and control panels are built in accordance with IEC 439 “Factory Built Assemblies for Low Voltage” or BS 5486 “Factory-built Assemblies of Switchgear and Control Gear for Voltage up to and including 1000 AC and 1200V DC. Switchboards SMBD, MDB, FDB are always type tested conforming to tests conducted by ASTA or other recognized testing authority....
SMDB, MDB, FDB LV Switchgear Panels & Distribution Board Construction & Specifications The switchboards, distribution boards including smbd and control panels are built in accordance with IEC 439 “Factory Built Assemblies for Low Voltage” or BS 5486 “Factory-built Assemblies of Switc…
26/09/2026
Steel Structure Building Construction Procedure
This procedure is useful for building construction based upon the project specifications for steel structure er****on work. Based on the design and specification, this document provides a proper step wise procedure and quality and safety management of the steel structure works. The following items/equipments are basic requirements for building construction of steel structure works at a large scale project. Lifting Equipment, Ropes & Lines....
Steel Structure Building Construction Procedure This procedure is useful for building construction based upon the project specifications for steel structure er****on work. Based on the design and specification, this document provides a proper st…