G C Building

G C Building

Share

Building, alterations and renovations are what we specialise in and working within clients homes is something we are very experienced at.

Photos from G C Building's post 20/09/2026

Another bathroom project completed with James Projekt Plumbing& Dan In2Tile.

Photos from G C Building's post 17/09/2026

Now completed.
It was good to work on this project with Calder Builders & get this one finished today.

Photos from G C Building's post 13/09/2026

Ensuite upgrade in progress.
The main bathroom was completed earlier in the year, now it's time for the ensuite to get a matching face lift, end results to come.

10/09/2026

Kitchen is almost complete.
Two panels left to paint, oven to install & Projekt Plumbing to do their fit off.

Photos from G C Building's post 08/09/2026

Here is another bathroom renovation that is under way, the existing bathroom was only 1500mm wide, so the toilet wall has been removed to create a bigger space to work with.
Insulation installed in the exterior wall, ceiling straightened with new battens, gib board is on & ready to be plastered.
Projekt Plumbing taking care of all the plumbing needs.

Photos from G C Building's post 07/09/2026

The cladding and roofing have reached their limit, with cladding splitting, coming off the walls and flashing tape being used to patch holes in the roof.
I think it’s time for a re-clad & re-roof.

24/08/2026

Not much to look at yet, soon to become a level entry shower with floor to ceiling tiles throughout.
In this bathroom, we have used wool insulation in the ceilings/walls, which is a NZ made product made up of 70% wool 30% recycled polyester. A great alternative if your looking for something a bit more natural & user friendly.

Photos from G C Building's post 21/08/2026

Kitchen, dining & living overhaul.
Installed new ceiling batten's to straighten the 75mm of sag, insulation installed to the exterior walls, gib board on.
Ready for plaster then paint.
Kitchen has been site measured & in production.
Finished results coming soon.

18/08/2026

Kitchen base cabinets are in, floor prep is underway. Cupboard doors, drawer fronts and end panels are off to be sprayed.
Granite top has been templated, looking forward to seeing the end result.

Photos from G C Building's post 16/06/2026

Another bathroom overhaul completed.
There wasn't much of the existing left only a few studs in the exterior wall & the floor joists.
A lot went into this bathroom, a couple of things that stand out for me was the Symphony Pinnacle shower tray, gunmetal tapware, full width tiled niche with mitered corners & the feature window as you walk in.
As usual great work from James at Projekt Plumbing & Dan at In2Tile

Want your business to be the top-listed Engineering Company in Levin?
Click here to claim your Sponsored Listing.

Telephone

Address

Levin

Alerts

Be the first to know and let us send you an email when G C Building posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Subscribe

We will notify you when anything happens in Levin.