Build With DC

Build With DC

Share

Since founding my company in 2007, I've been blessed with developing personal relationships with my

07/04/2022
Photos from Build With DC's post 06/07/2022

Creek Bend
Sheet rock is installed and textured.
Trim and casing has started.
The exterior of the house has been painted.

Photos from Build With DC's post 05/02/2022

Creek Bend
The framework has started on the master suite and covered patio and the front porch.

Photos from Build With DC's post 04/28/2022

Whistling Pines
The completion of the attic space turned into craftroom/ mommy getaway.
It turned out beautiful!

Photos from Build With DC's post 04/28/2022

Creek Bend
Videos and some pictures of the foundation pour for the master suite.

Photos from Build With DC's post 04/28/2022

Creek Bend
The completion of demo, also, preparation of the foundation pour of the relocation of the master suite.

Photos from Build With DC's post 04/28/2022

Creek Bend
New project!
This project is a full renovation, inside and exterior of the home.
Before pictures and demo.

04/17/2022

HAPPY EASTER!

-BUILD WITH DC

Photos from Build With DC's post 04/15/2022

Whistling Pines
The attic space has been textured and painted along with board and batton installed on the ceiling, it adds a nice texture to the ceiling, looks fabulous! Vinyl plank flooring is being installed.

Photos from Build With DC's post 04/05/2022

Whistling Pines
The attic space that us being converted into a craftroom/ mommy getaway is coming along.
Sheetrock is installed, trim and shelves have been installed in the closets.

Want your business to be the top-listed Engineering Company in Houston?
Click here to claim your Sponsored Listing.

Telephone

Address

Houston, TX

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm