Manup

Manup

Share

Manup is the new way companies connect and hire workers in the oil and energy industry

03/19/2026

This footage has sparked critical conversations across the HSE community.
Do you spot any safety risks/hazards in this lifting operation?

03/12/2026

Automation is now being applied on the rig floor, and is one of the most significant shifts happening in drilling operations today.

Would you agree that automation is not stealing jobs or replacing people, but redefining how they work?

What’s your take on this development? Do you believe automation could eliminate certain job roles on the rig floor? We’d love to hear your thoughts 👇

02/19/2026

Drilling isn’t a dramatic strike of black gold. It’s layered engineering executed in sequence.
What does it actually take to produce from on onshre ?
What actually happens between the location survey and the first production on an onshore well?

©️📹 Video Credits:

02/19/2026

Drilling isn’t a dramatic strike of black gold. It’s layered engineering executed in sequence.

What does it actually take to produce from on onshre ?
What actually happens between the location survey and the first production on an onshore well?

Photos from Manup's post 01/22/2026

𝐓𝐡𝐞 𝐑𝐨𝐚𝐝 𝐭𝐨 𝐅𝐢𝐫𝐬𝐭 𝐎𝐢𝐥: — UGANDA’S UPSTREAM IS ENTERING THE PRODUCTION PHASE!
Uganda’s oil story has moved past discovery and appraisal. It is now in the production-build phase.

With Kingfisher and Tilenga approaching mechanical completion, Uganda is transitioning from drilling wells to flowing hydrocarbons through processing facilities and export systems — the point where oil becomes revenue.

This is not a media milestone. It is a systems-integration milestone.

What “first oil” actually means🤔
First oil happens when: 𝐫𝐞𝐬𝐞𝐫𝐯𝐨𝐢𝐫𝐬 → 𝐰𝐞𝐥𝐥𝐬 → 𝐩𝐫𝐨𝐜𝐞𝐬𝐬𝐢𝐧𝐠 𝐩𝐥𝐚𝐧𝐭𝐬 → 𝐞𝐱𝐩𝐨𝐫𝐭 𝐩𝐢𝐩𝐞𝐥𝐢𝐧𝐞𝐬 all work as one system.

Uganda holds about 6.5 billion barrels in place, but as the Petroleum Authority of Uganda (PAU) explains, only 20–30% is technically recoverable because oil is trapped in rock pores, not underground lakes.
That is why these fields are being built with:
📍Injection wells
📍Pressure management
📍Future Enhanced Oil Recovery (EOR)

This is not short-term extraction — it is 30-year field development.
Once first oil flows:
📌Crude moves through the CPFs
📌Export systems activate
📌Revenue, royalties, and local content follow

Uganda moves from a resource owner to a producing petroleum state. That is when drilling teams become production crews and service companies shift from construction to long-term operations and maintenance.

Insight:
Uganda is not “getting ready” for oil anymore.
It is entering the production era.
The road to first oil is almost complete.
The road to 30 years of production is just beginning.

Manup is connecting Africa’s energy workforce to where the work actually happens.

12/25/2025

While the year winds down, real work doesn’t.
Here’s to the professionals who show up — season after season.
Season’s greetings from Manup.



12/16/2025

Most people see a lift.
Engineers see margins.

What looks routine from above is constant decision-making: load radius vs chart limits, wind thresholds, swing clearance, signal integrity, blind spots, ground signals, and zero tolerance for error.

Inside that cab, it’s geometry, timing, load charts, wind calls, radio discipline, and muscle memory working together. Every movement you’re watching is calculated.

Operating a crane isn’t about strength. It’s about judgment under pressure, and applied engineering in real time — where one misjudgment cascades through safety, schedule, and asset integrity.

Question for the field:
What’s the one decision a crane operator makes that people outside the industry never notice—but everything depends on? 👇
As a crane operator, what's a typical workday like for you?

©️📹 Credits: persiandrillerman

Want your business to be the top-listed Engineering Company in Houston?
Click here to claim your Sponsored Listing.

Telephone

Address

Houston, TX