Da-Lee
Da-Lee offers a Permanent Pothole Repair as well as Road Repair solutions.
09/18/2026
This week, Matthew Kinson attended APOM alongside our Quebec distribution partner, Multiflex. ๐ค
It was a great opportunity to connect with industry professionals, exchange ideas, and discuss the future of pavement maintenance and road infrastructure across Quebec and beyond. ๐ฃ๏ธ
Thank you to everyone who took the time to connect with Matthew and the Multiflex team. We appreciate the conversations and look forward to building on these relationships. ๐
09/16/2026
๐ง Manhole Repair Demo in Gananoque Fast, Durable, Traffic-Ready in 2 Hours ๐ง
Matthew Morgado and Terry Hill were recently in the Town of Gananoque showcasing the Da-Lee Manhole Repair System with an on-site demo.
Risers beneath the lid were cracked and deteriorated, a common failure point that can lead to costly road damage and safety hazards.
โ
Removed the damaged components
โ
Repaired the structure using our Manhole Repair System
โ
Sealed the product with Flow Fix for maximum protection against future failure
โ
Opened the repair to traffic in just 2 hours
With Flow Fixโs rapid cure and superior sealing properties, this solution not only restores structural integrity but also extends the life of the surrounding repair.
Long-lasting results. Minimal disruption. Thatโs the Da-Lee difference.
09/15/2026
A great follow-up from the Village of Tarrytown after our recent demonstration of our Manhole System! ๐ง
Tarrytown shared photos from the demo a couple of weeks later, and the results are impressive. ๐ธ
The repair is still holding up exceptionally well, exceeding expectations for durability and performance. ๐ช
Their team noted that a conventional cold patch would likely have failed by this point. Itโs awesome feedback and a strong example of how the Manhole Replacement System can help municipalities complete durable, efficient repairs with less disruption. โ
Thank you to the Village of Tarrytown for hosting us and for sharing these follow-up photos! ๐
09/11/2026
๐ Bridge Deck Repair Success with QC10 on NY Thruway Weedsport
Matt Kinson recently demonstrated QC10 rapid-set concrete for bridge deck repair on the NY Thruway at Weedsport, and the feedback was outstanding.
โ
The crew praised QC10โs workability and ease of use compared to their current product
โ
Even during an unexpected rainstorm, QC10 set up reliably and remained easy to place
โ
Result: 2 pallets ordered immediately after the demo
The ability to keep working in wet conditions meant the road didnโt need to stay shut down any longer than necessary, a win for both the crew and the public.
Proud to support faster, smarter infrastructure repairs with QC10. ๐ง๐ช
09/04/2026
๐ง Real-world repair, real results! ๐ง
Matthew Morgado led an impressive demo with the Municipality of Southgate! ๐
The challenge? A cracked and lowered manhole caused by previous weak parg repairs. ๐ฅ
The solution? We opened it up using QC10 and PRR, and completed a seamless, long-term repair in just 2 hours! โฑ๏ธโ
This is what durable, efficient infrastructure maintenance looks like. Proud of the work weโre doing to raise the standard, one repair at a time. ๐ช๐ ๏ธ
09/03/2026
๐ง Demo Day with the City of Buffalo Sewer Department! ๐ง
Matt Kinson recently showcased the full Manhole Repair System in action with the City of Buffalo Sewer Department and it was a game-changer. ๐ช
This wasnโt your typical repair. The chamber required a slight rebuild, which under conventional methods would mean resetting bricks with regular mortar, and coming back the next day to finish the job. โณ
But with QC10 rapid-set flowable concrete and the Mortar Buoyยฎ inflatable dam, the team poured a new chamber that was ready to set the manhole in just 20 minutes! โฑ๏ธโ
The result? Job completed, road reopened, and traffic flowing, all before lunch time. ๐
Big thanks to the City of Buffalo Sewer Department for hosting and for their commitment to innovation in infrastructure maintenance. Together, we're making repairs faster, stronger, and more efficient. ๐ค๐๏ธ
09/01/2026
Great conversations and connections at the Road & Street Maintenance Conference! ๐ง๐ฃ๏ธ
Matt Stiller was proud to represent Da-Lee Pavement Products at Booth 39 during the conference, held in Wenatchee, WA on August 31 and September 1, 2026. The event brought together roadway and pavement professionals to share knowledge, explore innovative products, and discuss solutions for safer, more durable roads. ๐ค
Thank you to everyone who stopped by Booth 39 yesterday and today, Matt enjoyed meeting you and connecting with fellow industry professionals! ๐
08/28/2026
๐ง Matthew Morgado and Terry recently completed a repair demonstration at one of Torontoโs busiest inner-city intersections: Bathurst Street and Davenport Road. ๐๏ธ
This manhole had been severely punished by heavy traffic, with regular repairs providing only temporary results and no lasting solution. ๐
Using our repair material, the crew was able to restore the area and reopen the intersection within just a couple of hours. โฑ๏ธโ
Fast installation. Minimal disruption. A repair solution built to perform under demanding conditions. ๐ช๐ฃ๏ธ
08/27/2026
Matthew Kinson recently completed a drainage inlet repair with the New York DOT in Erie County North, and had the roadway back open to traffic in just 45 minutes! ๐งโฑ๏ธ
Traditional concrete repairs often require a steel plate to remain over the work area while the concrete cures. This can create a potential hazard โ ๏ธ, require a return visit ๐, and add unnecessary manual handling for crews ๐ช.
By using QC10 and sealing the joints with Flow Fix, Matthew completed the repair quickly and safely eliminating the need for a steel plate or repeat visit. โ
A durable repair, reduced disruption, and a safer job for the crew. ๐ฃ๏ธ๐ทโโ๏ธ
08/21/2026
๐ง Same-day reopening on a high-traffic roadway. ๐
Matthew Kinson recently demonstrated our Manhole System with the Village of Wappingers Falls on a busy street carrying heavy truck traffic.
The project was completed and the roadway was reopened the same day, helping minimize disruption for residents, local businesses, and commuters. โฑ๏ธ
Now, the repair will be put to the test under real-world traffic conditions. We look forward to seeing the long-term performance of the system in this demanding application. ๐ช
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
350 Jones Road
Hamilton, ON
L8E5N2
Opening Hours
| Monday | 9am - 5pm |
| Tuesday | 9am - 5pm |
| Wednesday | 9am - 5pm |
| Thursday | 9am - 5pm |
| Friday | 9am - 5pm |