Bobby Built

Bobby Built

Share

Roofing and home renovations in Moncton, Dieppe, Riverview and surrounding areas. Built right the first time.

Fully insured and at your service with 24/7 emergency repair service 506-543-7663

Photos from Bobby Built's post 09/22/2026

Phase 2 is in full swing! All needed prep work has now been completed, and new decking is going down piece by piece — this backyard is really taking shape.

Photos from Bobby Built's post 09/17/2026

Phase 1 of this deck rebuild is underway in Saint Louis De Kent— old decking stripped down to the joists to prep for the new build!

Stay tuned as we bring this backyard back to life.

Photos from Bobby Built's post 09/04/2026

Phase 11: So close to done! This home addition and enclosed deck are nearly finished, with just a few small odds and ends left to wrap up.

08/25/2026

Phase 10: Wood ceiling is going up in the enclosed deck, bringing this project one step closer to the finish line!

Photos from Bobby Built's post 08/20/2026

Phase 9: Roof is up on the enclosed deck and finishing touches continue to come together on this project!

Photos from Bobby Built's post 08/18/2026

Phase 8: Hardwood flooring is down thank to Phillips Flooring Service! 🪵✨ This addition is really starting to look move-in ready.

Photos from Bobby Built's post 08/13/2026

This home addition is entering its final stretch! In Phase 7, the walls and ceiling are being painted.

Meanwhile, the wood flooring has been brought in and is acclimating to the room's temperature and humidity — an important step that ensures the boards settle properly before installation, preventing gaps or warping down the road.

Photos from Bobby Built's post 08/11/2026

Phase 6: New decking is going down on the deck portion of this home addition, with posts curtesy of Postech Screw Piles Moncton. Watch as we continue this home and backyard transformation!

Photos from Bobby Built's post 08/07/2026

Phase 5 progress! 🧱 Insulation is in and drywall is going up — this addition is officially starting to feel like a room!

Photos from Bobby Built's post 08/05/2026

Phase 4 done! ⚡🔧 Rough-in electrical curtesy of Brunswick Solar and Electric and plumbing by Thomson Plumbing are complete inside the addition — behind these walls, this space is really coming to life!

Want your business to be the top-listed Contractor in Moncton?
Click here to claim your Sponsored Listing.

Telephone

Address


83 Barrieau Road
Moncton, NB
E1G1J5

Alerts

Be the first to know and let us send you an email when Bobby Built posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Subscribe

We will notify you when anything happens in Moncton.