Azortum

Azortum

Share

Azortum - From A to Z, we'll sort it out! From A to Z, we'll sort it out! Azortum delivers waste sorting and bulk handling solutions to fit your business.

We design, develop and deliver by using the best equipment and reusing what you already have. We take your requirements and deliver what you need. We are specialists so you don't have to be. https://www.azortum.com/

01/10/2026

Packaging waste goes in; valuable material comes out. ♻️

Making this work reliably at an industrial scale is anything but simple, because input material can vary, and space for the line can be limited.

Sometimes a facility needs to be rebuilt and operational within months. Other times, the system has to be designed in stages because the exact composition of the waste stream is still evolving.

That is where engineering, experience, and flexibility matter.

At Azortum, we design and deliver waste sorting lines that align with the operator's long-term business goals, taking into account material streams, capacity needs, and available building footprint. Every step, from pre-sorting to final quality control, is designed to recover more value from waste.

Over the years, we have helped waste management companies overcome complex sorting challenges across the Baltics and Nordics.

👉 See how we solve these challenges in practice:
https://www.azortum.com/

24/09/2026

When a region grows, so does its need for heat and electricity.

To meet that demand in Östersund, Jämtkraft AB built a new combined heat and power plant. This required a high-capacity wood shredding line with the flexibility to use a much wider range of fuels.

Fuel flexibility means that the line can process everything from sawdust and bark to wet forest residues, recycled wood, and timber unsuitable for other uses. Its two shredding stages turn those varied materials into consistent P63 fuel for the boilers, at up to 70 tonnes per hour.

That gives Jämtkraft more options when sourcing fuel and helps reduce costs. The line also supports its move from 20% to 75% recycled wood use, while delivering the consistent fuel quality needed for better boiler performance.

👉 Watch the line in action and read the full story:
https://www.azortum.com/blog/jamtkrafts-wood-shredding-line-for-chp-plant/

18/09/2026

A common challenge when developing or upgrading a waste sorting line is limited space.

Existing buildings can deal you a set of constraints like restricted ceiling heights, structural columns, and narrow installation routes. Other times, there's very little wiggle room to place conveyors, sorting equipment, or create maintenance access for maintenance crews.

And when operations don't stop during the upgrade, the available installation area becomes even tighter.

At Ecoservice, these constraints were combined with an ambitious project schedule. We began installing the household packaging waste sorting line before the engineering team completed the full package.

This meant that equipment such as the drum screen had to be installed through a partially finished roof, with only centimeters of clearance.

Yet, despite these conditions, the line was completed and entered the testing phase ahead of schedule.

👉 Learn more about how we achieved this:
https://www.azortum.com/blog/ecoservice-packaging-waste-sorting-line/

04/09/2026

When we started designing this heavy-duty waste sorting line, we focused on two key objectives:

✅ Capacity: the system needed to process 25 tons of waste per hour.

This is achieved with a heavy-duty feeding conveyor that transports material to a vibrating screen, which separates it into different fractions.

✅ Quality and meeting specific aggregate standards.

Some fractions go to air separators, while others are manually sorted. One line handles positive sorting, and the other ensures quality control by cleaning the stone fractions for maximum efficiency and accuracy.

👉 Learn more about this new C&D waste sorting line in Latvia:
https://www.azortum.com/blog/construction-and-demolition-waste-sorting-line-in-latvia/

Photos from Azortum's post 28/08/2026

How well does a waste sorting line perform after years of daily operation?

We checked in with Ekokaari, with whom we worked in 2024, to upgrade their C&D waste sorting line in Finland. The investment replaced worn-out equipment that had been in use for more than 10 years, but the objective went beyond merely renewing aging machinery.

Ekokaari's goals were to double the amount of material recycled, improve fraction purity, and create a more reliable process that can adapt to future material streams.

Now, two years later, Ekokaari says the line has met those expectations:

✅ The amount of recycled material has doubled
✅ Efficiency has improved significantly
✅ Better separation has increased the fraction purity.

Aki Koivula, CEO of Ekokaari, highlights that:

"In particular, the operational reliability and ease of maintenance have been a positive surprise, even though a lot of attention was paid to them during the design and assembly phase."

One engineering decision has been especially important in daily operation.

Instead of replacing the worn-out ballistic separator with another similar unit, Azortum integrated a three-fraction air separator. According to Ekokaari, it has provided better separation capacity while proving less prone to failure.

With the original recycling target achieved, Ekokaari has now set its sights on further improving material recovery and the accuracy of plastics sorting.

👉 Read the full story behind this sorting line:
https://www.azortum.com/blog/cd-waste-sorting-line-in-finland/

Photos from Azortum's post 24/08/2026

What does it take to set up a new waste sorting line?

The engineering challenge is only one part of the project.

Before we design the line, we need to understand what it has to deliver for your business. What material streams will it process? What capacity do you need? What recovery targets, space limitations, budget, and compliance requirements need to be built into the plan?

Good planning also looks beyond day one.

A sorting line should be designed with the future in mind, whether you need to extend capacity, improve output quality, adapt to new material streams, or eventually dismantle and rebuild parts of the system.

That is why our process starts before the machinery is selected.

We have put together an overview of how Azortum approaches a new waste sorting project, from the first business case to installation, commissioning, and long-term support.

Here’s our working process — from A to Z.

👉 Need to sort out your waste? Let’s talk:
https://www.azortum.com/

21/08/2026

The most important decisions in a sorting line project are made before a single machine is selected.

Each set of goals and constraints lead to different engineering decisions.

That is why we start with the operation itself. To name a few, this includes aspects like the business objective, input material, capacity, required output quality, available space, existing equipment, and downstream use.

Only after that can we select the equipment and develop its placement in the system.

That's why, in this example, the MSW line avoids unnecessary shredding, the C&D line is built for heavy loads and recovery quality, and the waste wood line is tuned to chip-size consistency.

Planning a waste sorting or bulk material handling project?

👉 Tell us what the system needs to achieve:
https://www.azortum.com/

14/08/2026

Waste goes in, valuable materials come out ♻️

But extracting that value requires a lot more than a standard solution and making it work reliably at an industrial scale is anything but simple.

Every sorting line has its own operational reality: input material can vary, space can be limited, and timelines can be tight. Yet before the engineering challenges can be tackled, it is important to look at the business objective first.

Once we understand what the line needs to achieve for your business, now and in the future, we can engineer the right system around it. The result is a sorting line that turns waste into valuable products.

👉 See how we've solved these challenges before:
https://www.azortum.com/

04/08/2026

One of the goals for this paper sorting line was to increase automation.

This was achieved by integrating specialist sorting technologies, such as NRT optical sorters and Max-AI robotic sorters, into the full process rather than treating them as separate machines.

The automated line gives the facility and its operators greater control over output quality. With these technologies, operators can adjust the quality of each fraction to meet customer requirements.

This, in turn, helps the company further industrialize waste management and, as a result, produce secondary raw materials that can compete with virgin materials.

In this project, Azortum's role was system integration; the main technology was provided by Bulk Handling Systems (BHS).

👉 Read the full story:
https://www.azortum.com/blog/paper-sorting-line-in-norway/

Photos from Azortum's post 29/07/2026

Even when two lines process the same type of waste and use similar machinery, each must be designed around a different facility, material stream, business case, and long-term objectives.

There is no standard package for a waste sorting line.

The same applies to the Baltic states, where every facility operates under different conditions. Input material, performance targets, site constraints, operational needs, and future requirements all shape the design and engineering of the line.

And as modern lines become more complex, these factors also become increasingly interconnected. Increasing throughput cannot come at the expense of recovery quality. New equipment must fit the available footprint. Installation must be planned around ongoing operations, while the finished line should still be able to adapt to future material volumes and regulatory requirements.

That is why the process should not start with a list of machines.

We believe the focus should be the operator's business objectives: what materials need to be recovered, what quality the market requires, where operational costs can be reduced, and what the facility will need to handle 5 years down the line.

Once these objectives are clear, we can select the right equipment and integrate it into a complete system.

In our latest blog post, we take a quick look at a selection of our latest projects in the Baltics, and ask what other operators can learn when planning a new line of their own.

We also wrote down a quick checklist of questions to ask yourself before investing in a new line or retrofit.

👉 Get a glimpse of waste sorting projects in the Baltics:
https://www.azortum.com/blog/waste-sorting-projects-in-baltics/

Want your business to be the top-listed Equipment Service in Tallinn?
Click here to claim your Sponsored Listing.

Telephone

Address


Valukoja 8/2, D Liftihall, 13 Korrus
Tallinn
11415

Alerts

Be the first to know and let us send you an email when Azortum posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Subscribe

We will notify you when anything happens in Tallinn.