Smart Civil Engineer
Follow Me For Civil Engineering Guide๐
09/09/2026
https://youtu.be/qBkMKVO83fA๐๐๐
Chimney Dimensions: โ Height = 10 m
โ Top Diameter = 4 m
โ Bottom Diameter = 6 m
โ Brick Size = 190 ร 90 ร 90 mm
โ Practical brickwork estimation
โ Chimney volume calculation
โ Approximate number of bricks
โ Mortar quantity
โ Step-by-step civil engineering calculation
This video is useful for Civil Engineers, Quantity Surveyors, Estimators, Site Engineers, Students, and Construction Professionals.
Chimney Estimation & Quantity Calculation | 10m Height, 4m Top & 6m Bottom Diameter In this video, we explain the complete estimation and quantity calc...
Stair Estimation โ
08/09/2026
๐ :24 KM Road
๐ Length: 24,000 m
๐ Width: 7.0 m
--------------
โก๏ธ Total Area = 24,000 ร 7 = 168,000 mยฒ โ
๐ง Application Rates & Calculations:
1๏ธโฃ Light (0.15 L/mยฒ)
= 168,000 ร 0.15 = 25,200 L
= 25,200 ร 0.98 = 24.696 t โ 27.17 t (with +10%)
๐ข๏ธ Drums = 25,200 รท 200 = 126 drums
2๏ธโฃ Typical (0.25 L/mยฒ)
= 168,000 ร 0.25 = 42,000 L
= 42,000 ร 0.98 = 41.16 t โ 45.28 t (with +10%)
๐ข๏ธ Drums = 42,000 รท 200 = 210 drums
3๏ธโฃ Heavy (0.40 L/mยฒ)
= 168,000 ร 0.40 = 67,200 L
= 67,200 ร 0.98 = 65.856 t โ 72.44 t (with +10%)
๐ข๏ธ Drums = 67,200 รท 200 = 336 drums
๐ Analysis:
โขLight coat ๐น used on dense & smooth asphalt โ saves cost but weaker bonding.
โขTypical coat ๐น best balance โ strong bond, widely adopted in road projects.
โขHeavy coat ๐น for porous / rough surfaces โ ensures bonding but cost is higher.
โข+10% wastage included for handling & spraying losses.
โ
Tack coat = essential bonding layer that prevents layer slippage, increases durability & extends pavement life.
=================================
PDF get NOW:https://t.me/SmartcivilengineerSCE/3638.
------ -------
06/09/2026
๐ FIDIC Red Book โ Conditions of Contract for Construction
The FIDIC Red Book is one of the most widely used international standard forms of construction contract. It is mainly intended for building and engineering projects where the design is provided by the Employer or the Engineer, while the Contractor is responsible for constructing the Works according to that design.
The current major edition is the Second Edition 2017, which updated the earlier 1999 Red Book. The 2017 edition provides more detailed requirements for notices and communications, claims, dispute avoidance, quality management, and verification of the Contractor's contractual compliance.
โก Important areas covered by the Red Book
โEmployer's and Contractor's responsibilities
โRole and authority of the Engineer
โContract documents and priority
โCommencement and Time for Completion
โPerformance Security
โQuality control and testing
โMeasurement and payment
โVariations and changes to the Works
โExtension of Time (EOT)
โContractor's and Employer's claims
โDelays and suspension
โTaking-Over of the Works
โDefects Notification Period
โFinal payment and completion
โDispute avoidance and dispute resolution
โTermination and related procedures
For engineers, quantity surveyors, project managers, consultants, contractors, and government project officials, understanding the Red Book is particularly useful for managing construction contracts, variations, claims, EOT, payments, delays, and disputes.
The 1999 Red Book remains important because it has been widely used internationally, while the 2017 Red Book is the newer edition.
๐ Read more / Official FIDIC Red Book:https://t.me/SmartcivilengineerSCE/4032
Easy Know Design of Footing ๐
if you From Afghanistan use this link Get essential App ๐ฆ๐ซ :https://application.hesab.com/DUH9TPER
Retaining Wall Estimation โ How Much Material? .
How to Calculate Concrete for a Staircase?๐ณ
17/08/2026
Concrete Mix Calculation for 2500 psi (M20) - Ratio 1:1.5:3
To achieve a concrete mix with a strength of 2500 psi (M20), using a ratio of 1:1.5:3 for cement, sand, and aggregate, follow these steps:
---
Step-by-Step Calculation
1. ๐ Volume of Concrete
Assume we need 1 cubic meter (mยณ) of concrete.
2. ๐ข Mix Ratio Calculation
Total mix ratio: 1 + 1.5 + 3 = 5.5
3. ๐ชจ Cement Calculation
Volume of cement = (1 / 5.5) ร 1 mยณ = 0.182 mยณ
Weight of cement = 0.182 mยณ ร 1440 kg/mยณ = 262 kg
Assuming 50 kg per bag, youโll need about 5.24 bags of cement.
4. ๐๏ธ Sand Calculation
Volume of sand = (1.5 / 5.5) ร 1 mยณ = 0.273 mยณ
Weight of sand = 0.273 mยณ ร 1600 kg/mยณ = 437 kg
5. ๐ชจ Aggregate Calculation
Volume of aggregate = (3 / 5.5) ร 1 mยณ = 0.545 mยณ
Weight of aggregate = 0.545 mยณ ร 1450 kg/mยณ = 790 kg
6. ๐ง Water Requirement
With a water-cement ratio of 0.5, water needed = 0.5 ร 262 kg = 131 liters
---
๐ Summary of Materials for 1 mยณ of Concrete (1:1.5:3 Ratio)
๐ชจ Cement: 262 kg (approx. 5.24 bags)
๐๏ธ Sand: 437 kg
๐ชจ Aggregate: 790 kg
๐ง Water: 131 liters
โค [๐๐๐๐๐๐ ๐๐ ๐๐๐๐๐๐]โค
ูููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููู
joint My channal :https://t.me/SmartcivilengineerSCE/3512
ูููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููููู
~
Must Know Engineer ๐
For Every Civil Engineer ๐