JayKay Process Engineering pvt ltd

JayKay Process Engineering pvt ltd

Share

JayKay Process Engineering are industrial company. We are doing mechanical and electrical Services.

A Leading Provider of Elevators and Material Handling Solutions in Sri Lanka 🇱🇰

✅Design, Fabrication, Supply, and Installation of Good Lifts,Material Lifts,Passenger Elevators,Disabled-Access Lifts
✅Comprehensive Servicing of All lifting Elevators Good lift, Hoist and Elevator fabrication, installation and service maintenance by jaykayproeng.

26/09/2026

පින්බර බිනර පුර පසලොස්වක පෝහොය දිනයක් වේවා!🙏
Wishing you a peaceful and blessed Binara Poya Day!🙏

A leading provider of elevators and material handling solutions in Sri Lanka 🇱🇰 - JayKay Process Engineering pvt ltd

14/09/2026

Do you know what this image represents in the field of elevators?

Lifting Plan
A lifting plan inside the hoistway must be prepared thoroughly and systematically. The use of lifting equipment must strictly correspond to its intended function and meet safety criteria, including having a clearly defined Safe Working Load (SWL), valid certification, and undergoing periodic inspections or routine calibrations.
Executing lifting operations in a planned manner and in accordance with Standard Operating Procedures (SOPs) provides several key operational benefits, including:

1. Preventing Workplace Accidents
Minimizing operational risks and ensuring occupational health and safety (OHS) for technicians working inside the hoistway.

2. Enhancing Operational Efficiency and Workflow
Preventing potential technical issues and downtime, thereby ensuring tasks are completed on schedule.

3. Preserving Lift Component Quality
Protecting elevator materials and components from physical damage caused by improper handling during the lifting process.

4. Optimizing Equipment Lifespan
Extending the service life of high-value tools and equipment through proper usage and regular maintenance.

5. Elevating Company Reputation and Credibility
Building a positive brand image and demonstrating professional excellence to clients and the broader construction industry.

Lifting Plan & Work Method Statement
Based on field experience in elevator installation and construction, there are 6 (six) primary stages that strictly require a detailed lifting plan and clear work method statement:

1. Guide Rail Lifting Plan
Planning the procedures and lifting equipment capacity for the transportation and installation of guide rails inside the hoistway.

2. Traction Machine Lifting Plan
Planning the rigging and lifting procedures to hoist the traction machine into the machine room or to the top of the hoistway for Machine Roomless (MRL) types.

3. Car Assembly Method
Standard procedures and step-by-step sequence for assembling the car frame, bottom platform, and elevator cabin.

4. Counterweight Frame Assembly Method
Safety protocols and procedural steps for positioning and assembling the counterweight frame structure.

5. Roping Method
Procedures for installing steel wire ropes. For Machine Roomless (MRL) units, using suspended scaffolding is strongly recommended to ensure technician safety and seamless work access.

6. Counterweight Loading Method
Step-by-step procedure for loading filler blocks into the counterweight frame in stages, aligned with load balancing calculations.

Authored by : [email protected]

27/08/2026

පින්බර නිකිණි පුර පසලොස්වක පෝහොය දිනයක් වේවා!🙏
Wishing you a peaceful and blessed Nikini Poya Day!🙏

A leading provider of elevators and material handling solutions in Sri Lanka 🇱🇰 - JayKay Process Engineering pvt ltd

26/08/2026

𝐄𝐢𝐝 𝐌𝐮𝐛𝐚𝐫𝐚𝐤❗Happy Hadji Festival🎉️
May your days be filled with happiness and success☪️🕌

A leading provider of elevators and material handling solutions in Sri Lanka 🇱🇰 - JayKay Process Engineering pvt ltd

29/07/2026

පින්බර ඇසල පුර පසලොස්වක පෝහොය දිනයක් වේවා!🙏
Wishing you a peaceful and blessed Esala Poya Day!🙏

A leading provider of elevators and material handling solutions in Sri Lanka 🇱🇰 - JayKay Process Engineering pvt ltd

29/06/2026

පින්බර පොසොන් පුර පසලොස්වක පෝහොය දිනයක් වේවා!🙏
Wishing you a peaceful and blessed Poson Poya Day!🙏

A leading provider of elevators and material handling solutions in Sri Lanka 🇱🇰 - JayKay Process Engineering pvt ltd

29/05/2026

පින්බර වෙසක් පුර පසලොස්වක පෝහොය දිනයක් වේවා!🙏
Wishing you a peaceful and blessed Vesak Poya Day!🙏

A leading provider of elevators and material handling solutions in Sri Lanka 🇱🇰 - JayKay Process Engineering pvt ltd

19/05/2026

ඔබත් කොළබ නගරයේ ද..? Sales,Marketing පුලුවන්ද..? මේ අවස්තාව ඔබටයි🫵

ශ්‍රී ලංකාවේ ප්‍රමුඛ පෙලේ ඉංජිනේරු ආයතනයක විකුනුම් හා අලෙවිකරණ තනතුරු සදහා පුරප්පාඩු ඇත✅💯

Position-Sales & Marketing Executive
Age-18~40
Field-Engineering Field

⭕ A highly competitive salary package.
⭕ Performance-driven incentives.
⭕ Fuel and vehicle allowances to support your growth.

Ready to light up your career?

📧 Send your CV to: [email protected]
📞 For inquiries: 0740245968
📍 Interviews at: Kandy Road,Kirillawala,Kadawatha

05/05/2026

📌️We Are Hiring Back Office Coordinator Expert(female)📌️

📍For Kadawatha Branch

Who can apply;
Freshers, experienced and non experience🧑‍🎓
⭕School leavers also can apply.
⭕Minimum qualification G.C.E. A/L
⭕Exhibit excellent English communication and interpersonal skills.
⭕Good computer literacy.

If you are interested in this opportunity,please send your CV to
📩 [email protected] Or 0707545968 Whatsapp

Category

Telephone

Address


Kandy Road, Ibulgoda
Kadawata

Opening Hours

Monday 08:30 - 17:00
Tuesday 08:30 - 17:00
Wednesday 08:30 - 17:00
Thursday 08:30 - 17:00
Friday 08:30 - 17:00
Saturday 08:30 - 13:00