Codetrace
๐ก๐ฉ๐๐๐๐ ๐ฃ๐ฎ๐ฟ๐๐ป๐ฒ๐ฟ ๐๐ฐ๐ผ๐๐๐๐๐ฒ๐บ
Codetrace represents world leading machine vision and smart warehouse company. Provide solution on industrial vision and AGV/AMR
Codetrace is not only a leading barcode one stop solution system provider, but also providing most cost-effective and advance overall vision system solution.
31/08/2026
๐๐ฎ๐ฝ๐ฝ๐ ๐ ๐ฒ๐ฟ๐ฑ๐ฒ๐ธ๐ฎ ๐๐ฎ๐.
Sixty-nine years on, Malaysia is still being built โ by engineers, operators, technicians and the people on every factory floor who keep things running.
That's the work we're part of, and we're glad to do it here.
Selamat Hari Merdeka from all of us at CodeTrace. ๐ฒ๐พ
25/08/2026
๐ฆ๐ฎ๐น๐ฎ๐บ ๐ ๐ฎ๐๐น๐ถ๐ฑ๐๐ฟ ๐ฅ๐ฎ๐๐๐น โจ
Today we pause to reflect on the character of Prophet Muhammad: his honesty in dealing with others, his patience, and his compassion.
Warm wishes from all of us at CODETRACE to our Muslim colleagues, customers and partners. ๐
10/08/2026
๐ ๐ผ๐๐ ๐ณ๐ฎ๐ฐ๐๐ผ๐ฟ๐ ๐ฎ๐๐๐ผ๐บ๐ฎ๐๐ถ๐ผ๐ป ๐ฝ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐๐ ๐ฑ๐ถ๐ฒ ๐ฎ๐ ๐๐ต๐ฒ ๐๐ต๐ถ๐๐ฒ๐ฏ๐ผ๐ฎ๐ฟ๐ฑ, ๐ป๐ผ๐ ๐๐ต๐ฒ ๐ฏ๐๐ฑ๐ด๐ฒ๐ ๐บ๐ฒ๐ฒ๐๐ถ๐ป๐ด.
The picture is too big. A full smart-factory transformation, every line, all at once. ๐ข๐ป๐น๐ ๐ญ๐ด% ๐ผ๐ณ ๐ ๐ฎ๐น๐ฎ๐๐๐ถ๐ฎ๐ป ๐บ๐ฎ๐ป๐๐ณ๐ฎ๐ฐ๐๐๐ฟ๐ฒ๐ฟ๐ ๐ต๐ฎ๐๐ฒ ๐ณ๐๐น๐น๐ ๐ถ๐บ๐ฝ๐น๐ฒ๐บ๐ฒ๐ป๐๐ฒ๐ฑ ๐๐ป๐ฑ๐๐๐๐ฟ๐ ๐ฐ.๐ฌ. 46% are still in the early stages.
So don't start there. Start with one process.
The one that's hardest to staff. The one that scraps the most parts. ๐ ๐ฎ๐๐ฒ๐ฟ๐ถ๐ฎ๐น ๐ต๐ฎ๐ป๐ฑ๐น๐ถ๐ป๐ด, ๐ฝ๐ฎ๐น๐น๐ฒ๐๐ถ๐๐ถ๐ป๐ด, ๐๐ถ๐๐๐ฎ๐น ๐ถ๐ป๐๐ฝ๐ฒ๐ฐ๐๐ถ๐ผ๐ป, ๐ฟ๐ฒ๐ฝ๐ฒ๐๐ถ๐๐ถ๐๐ฒ ๐๐ฒ๐น๐ฑ๐ถ๐ป๐ด. Automate that single cell, then measure four numbers against your old baseline: labour cost per unit, defect rate, throughput, downtime.
If the cell pays, point the saving at your next-worst bottleneck. Repeat. That's how a plant becomes a smart factory, one proven step at a time.
You're not buying a factory of the future. You're buying back one shift you can't staff.
๐ฃ๐ถ๐ฐ๐ธ ๐ผ๐ป๐ฒ ๐ฝ๐ฟ๐ผ๐ฐ๐ฒ๐๐. ๐ช๐ฒ'๐น๐น ๐๐ฐ๐ผ๐ฝ๐ฒ ๐๐ต๐ฒ ๐ฟ๐ฒ๐๐.
๐
๐๐๐ ๐๐๐๐ ๐๐ ๐๐๐๐๐ก๐๐๐๐.๐๐๐.๐๐ฆ/๐๐๐๐ก๐๐๐ฆ-๐๐ข๐ก๐๐๐๐ก๐๐๐-๐๐๐ก๐๐๐๐๐ /
07/08/2026
๐ฌ๐ผ๐ ๐ฐ๐ฎ๐ป'๐ ๐ต๐ถ๐ฟ๐ฒ ๐๐ผ๐๐ฟ ๐๐ฎ๐ ๐ผ๐๐ ๐ผ๐ณ ๐ ๐ฎ๐น๐ฎ๐๐๐ถ๐ฎ'๐ ๐น๐ฎ๐ฏ๐ผ๐๐ฟ ๐ฐ๐ฟ๐๐ป๐ฐ๐ต ๐ฎ๐ป๐๐บ๐ผ๐ฟ๐ฒ.
Here's the reframe most factory owners miss: automation isn't displacing your people. In a shortage, there's no surplus to displace โ only shifts you can't staff and work that isn't getting done.
๐ฆ๐ผ ๐ฎ๐๐๐ผ๐บ๐ฎ๐๐ฒ ๐๐ต๐ฒ ๐๐ฎ๐๐ธ, ๐ป๐ผ๐ ๐๐ต๐ฒ ๐ฝ๐ฒ๐ฟ๐๐ผ๐ป:
โ Robotics takes the physical motions โ handling, welding, packing โ with no fatigue, overtime or turnover
โ Machine vision (AOI) inspects every unit at line speed, catching what a tired eye misses
โ Your people move up into robotics, automation and process roles
And you don't have to boil the ocean.
๐ข๐ป๐น๐ ๐ญ๐ด% ๐ผ๐ณ ๐ ๐ฎ๐น๐ฎ๐๐๐ถ๐ฎ๐ป ๐บ๐ฎ๐ป๐๐ณ๐ฎ๐ฐ๐๐๐ฟ๐ฒ๐ฟ๐ ๐ต๐ฎ๐๐ฒ ๐ณ๐๐น๐น๐ ๐ฎ๐ฑ๐ผ๐ฝ๐๐ฒ๐ฑ ๐๐ป๐ฑ๐๐๐๐ฟ๐ ๐ฐ.๐ฌ โ the national roadmap targets a jump in robot density from 55 to 195 per 10,000 workers by 2030. The field is wide open. Automate one high-labour or high-defect line, measure it against the wage bill and scrap rate, then reinvest into the next bottleneck.
The real risk isn't the price of the first machine. It's waiting, while the plants that started pull ahead.
๐ฌ๐ผ๐ ๐ฐ๐ฎ๐ป'๐ ๐ต๐ถ๐ฟ๐ฒ ๐๐ต๐ฒ ๐๐ต๐ผ๐ฟ๐๐ฎ๐ด๐ฒ ๐ฎ๐๐ฎ๐. ๐ฌ๐ผ๐ ๐ฐ๐ฎ๐ป ๐ฎ๐๐๐ผ๐บ๐ฎ๐๐ฒ ๐ถ๐ ๐ฎ๐๐ฎ๐.
๐
๐๐๐ ๐๐๐๐ ๐๐ โ๐ก๐ก๐๐ ://๐ค๐ค๐ค.๐๐๐๐๐ก๐๐๐๐.๐๐๐.๐๐ฆ/๐๐๐๐ก๐๐๐ฆ-๐๐ข๐ก๐๐๐๐ก๐๐๐-๐๐๐ก๐๐๐๐๐ /
05/08/2026
๐ ๐ผ๐๐ ๐ผ๐ณ ๐๐ต๐ฎ๐ ๐๐ผ๐๐ฟ ๐๐ข๐ ๐ณ๐น๐ฎ๐ด๐ ๐ถ๐ ๐ป๐ผ๐ ๐ฎ ๐ฑ๐ฒ๐ณ๐ฒ๐ฐ๐.
On typical SMT lines, 30 to 80 percent of AOI calls are false. Every one still gets checked by a person. That is not just wasted labour. Fatigued review of endless good boards desensitizes the operator, and desensitized operators start passing the real defects. High false call rates manufacture escapes.
๐ง๐ต๐ฒ ๐๐ฟ๐ผ๐ป๐ด ๐ณ๐ถ๐
๐ถ๐ ๐น๐ผ๐ผ๐๐ฒ๐ป๐ถ๐ป๐ด ๐๐ต๐ฟ๐ฒ๐๐ต๐ผ๐น๐ฑ๐. Every widened tolerance is a door a real defect walks through, and the parts generating your false calls are often your top sources of real ones.
Below ~10 percent, rule tuning hits diminishing returns and ML takes the review, cutting up to 60 percent of manual verification. The catch is training data: real defect images are scarce because defects are rare. That is the gap we attack with ๐ก๐ฉ๐๐๐๐-๐ฝ๐น๐ฎ๐๐ณ๐ผ๐ฟ๐บ ๐ฑ๐ฒ๐ณ๐ฒ๐ฐ๐ ๐ถ๐บ๐ฎ๐ด๐ฒ ๐ด๐ฒ๐ป๐ฒ๐ฟ๐ฎ๐๐ถ๐ผ๐ป.
๐ก๐ฒ๐๐ฒ๐ฟ ๐๐ฟ๐ฎ๐ฑ๐ฒ ๐ฒ๐๐ฐ๐ฎ๐ฝ๐ฒ๐ ๐ณ๐ผ๐ฟ ๐พ๐๐ถ๐ฒ๐. ๐๐ฟ๐ผ๐๐ป๐ถ๐ป๐ด ๐ถ๐ป ๐ณ๐น๐ฎ๐ด๐? ๐ฆ๐ฒ๐ป๐ฑ ๐๐ ๐๐ผ๐๐ฟ ๐๐๐ฅ.
๐
๐๐๐ ๐๐๐๐ ๐๐: โ๐ก๐ก๐๐ ://๐ค๐ค๐ค.๐๐๐๐๐ก๐๐๐๐.๐๐๐.๐๐ฆ/๐๐๐โ๐๐๐-๐ฃ๐๐ ๐๐๐-๐๐๐ก๐๐๐๐๐ /
03/08/2026
๐ ๐บ๐ฎ๐ฐ๐ต๐ถ๐ป๐ฒ ๐ฐ๐ฎ๐๐ฐ๐ต๐ฒ๐ ๐บ๐ผ๐ฟ๐ฒ ๐ฎ๐ป๐ฑ ๐ป๐ฒ๐๐ฒ๐ฟ ๐๐ถ๐ฟ๐ฒ๐.
Most AOI-vs-manual debates argue the wrong number. ๐๐ฒ๐๐ฒ๐ฐ๐๐ถ๐ผ๐ป ๐ฟ๐ฎ๐๐ฒ ๐ถ๐ ๐ฟ๐ฒ๐ฎ๐น (a human runs 70 to 80% under production pacing, a tuned AOI 95%+), ๐ฏ๐๐ ๐ถ๐ ๐ถ๐๐ป'๐ ๐๐ต๐ฒ๐ฟ๐ฒ ๐๐ต๐ฒ ๐ฑ๐ฒ๐ฐ๐ถ๐๐ถ๐ผ๐ป ๐๐ถ๐๐. ๐ง๐ต๐ฒ ๐ฐ๐ผ๐๐ ๐ถ๐.
๐๐ฒ๐ฟ๐ฒ'๐ ๐๐ต๐ฎ๐ ๐๐ต๐ฒ ๐ฅ๐ข๐ ๐ฑ๐ฒ๐ฐ๐ธ ๐๐๐๐ฎ๐น๐น๐ ๐น๐ฒ๐ฎ๐๐ฒ๐ ๐ผ๐๐:
The human column looks cheap. RM 1.9 to 2.5k a month base, until you multiply by coverage. Three shifts need three times the headcount, plus relief and turnover. Manual cost scales linearly with volume and shift count.
The machine column looks expensive. RM 50 to 200k up front, until you amortize it over five years. But two costs never make the quote: programming every product and revision, and the verification operator re-judging a 30 to 80% false-call ratio. That operator is part of the AOI's cost, not a leftover from the manual era.
The honest answer for most factories is a hybrid line. Machines on the repeatable. People on the judgment.
๐
๐๐๐ ๐๐๐๐ ๐๐: โ๐ก๐ก๐๐ ://๐ค๐ค๐ค.๐๐๐๐๐ก๐๐๐๐.๐๐๐.๐๐ฆ/๐๐๐โ๐๐๐-๐ฃ๐๐ ๐๐๐-๐๐๐ก๐๐๐๐๐ /
31/07/2026
๐ฌ๐ผ๐๐ฟ ๐๐ฎ๐ฟ๐ฒ๐ต๐ผ๐๐๐ฒ ๐น๐ผ๐ผ๐ธ๐ ๐ณ๐๐น๐น. Most of what you're paying for is empty air above the racking.
A recent study put average peak occupancy at 85.6%, and 47% of facilities said they needed more space. But occupancy only tells you whether your locations are filled, not how much of the building you're actually using.
๐๐ป ๐๐ฟ๐ฎ๐ฑ๐ถ๐๐ถ๐ผ๐ป๐ฎ๐น ๐ฝ๐ฎ๐น๐น๐ฒ๐ ๐ฟ๐ฎ๐ฐ๐ธ๐ถ๐ป๐ด, ๐๐๐ผ๐ฟ๐ฒ๐ฑ ๐ด๐ผ๐ผ๐ฑ๐ ๐๐ฎ๐ธ๐ฒ ๐๐ฝ ๐ท๐๐๐ ๐ฎ๐ฎโ๐ฎ๐ณ% ๐ผ๐ณ ๐๐ต๐ฒ ๐ฐ๐๐ฏ๐ถ๐ฐ ๐๐ผ๐น๐๐บ๐ฒ. The rest is aisles, clearances, and the gap between your top pallet and the roof.
So before you sign a new lease:
โ ๐๐ฑ๐ฑ ๐ฏ๐ฒ๐ฎ๐บ ๐น๐ฒ๐๐ฒ๐น๐. Taller racking is the cheapest volume you'll ever buy.
โ ๐ก๐ฎ๐ฟ๐ฟ๐ผ๐ ๐๐ต๐ฒ ๐ฎ๐ถ๐๐น๐ฒ๐. Turn drive lanes into pallet positions.
โ ๐ฆ๐น๐ผ๐ ๐ฏ๐ ๐๐ฒ๐น๐ผ๐ฐ๐ถ๐๐, ๐ฎ๐ป๐ฑ ๐ฐ๐น๐ฒ๐ฎ๐ฟ ๐ผ๐๐ ๐ฑ๐ฒ๐ฎ๐ฑ ๐๐๐ผ๐ฐ๐ธ.
โ ๐ข๐ป๐น๐ ๐๐ต๐ฒ๐ป ๐๐ต๐ฒ ๐ฏ๐๐ถ๐น๐ฑ๐ถ๐ป๐ด ๐ถ๐ ๐ณ๐๐น๐น ๐ผ๐ณ ๐๐๐ผ๐ฐ๐ธ, not air, does automated vertical storage earn its capital, reclaiming up to 85% of the floor shelving wastes.
๐ ๐ฒ๐ฎ๐๐๐ฟ๐ฒ ๐๐ผ๐๐ฟ ๐ฐ๐๐ฏ๐ถ๐ฐ ๐๐๐ฒ ๐ฏ๐ฒ๐ณ๐ผ๐ฟ๐ฒ ๐๐ผ๐ ๐น๐ฒ๐ฎ๐๐ฒ.
๐
๐๐๐ ๐๐๐๐ ๐๐: โ๐ก๐ก๐๐ ://๐ค๐ค๐ค.๐๐๐๐๐ก๐๐๐๐.๐๐๐.๐๐ฆ/๐ ๐๐๐๐ก-๐ค๐๐๐โ๐๐ข๐ ๐-๐๐๐ก๐๐๐๐๐ /
30/07/2026
๐ฌ๐ผ๐๐ฟ ๐๐๐ผ๐ฐ๐ธ ๐ฐ๐ผ๐๐ป๐ ๐ถ๐ ๐๐ฟ๐ผ๐ป๐ด. Not because your team is careless, but because the average warehouse runs at just 65โ75% inventory accuracy, while the benchmark most aim for is 97% or higher.
๐ ๐ฟ๐ฒ๐ฐ๐ผ๐ฟ๐ฑ ๐ฑ๐ผ๐ฒ๐๐ป'๐ ๐ด๐ผ ๐๐ฟ๐ผ๐ป๐ด ๐ฎ๐น๐น ๐ฎ๐ ๐ผ๐ป๐ฐ๐ฒ. It drifts one handling event at a time: a mislabeled carton at receiving, a misread label at picking, stock moved without a system transaction, shrinkage hiding between annual counts. ๐๐ฎ๐ฟ๐ฐ๐ผ๐ฑ๐ฒ๐ ๐ผ๐ป๐น๐ ๐ฐ๐ฎ๐ฝ๐๐๐ฟ๐ฒ ๐๐ต๐ฎ๐ ๐ฎ ๐ฝ๐ฒ๐ฟ๐๐ผ๐ป ๐ฟ๐ฒ๐บ๐ฒ๐บ๐ฏ๐ฒ๐ฟ๐ ๐๐ผ ๐๐ฐ๐ฎ๐ป.
Two fixes actually move the number:
โ ๐๐ผ๐๐ป๐ ๐ฐ๐ผ๐ป๐๐ถ๐ป๐๐ผ๐๐๐น๐, ๐ป๐ผ๐ ๐ผ๐ป๐ฐ๐ฒ ๐ฎ ๐๐ฒ๐ฎ๐ฟ. Cycle counting with blind counts and root-cause reviews costs nothing but discipline and surfaces errors within days, while they're still traceable.
โ ๐ง๐ต๐ฒ๐ป ๐๐ฎ๐ธ๐ฒ ๐ฑ๐ฎ๐๐ฎ ๐ฒ๐ป๐๐ฟ๐ ๐ผ๐๐ ๐ผ๐ณ ๐ต๐๐บ๐ฎ๐ป ๐ต๐ฎ๐ป๐ฑ๐. RFID pushes accuracy past 99.9%; AI vision counts cases automatically and inches toward 100%.
Run them in that order โ fix the process, then automate the input. Never point a camera at a broken process. One analysis found raising accuracy from 65% to 93% lifted gross sales by ~9%.
๐ง๐ต๐ฒ ๐๐๐๐๐ฒ๐บ ๐ป๐๐บ๐ฏ๐ฒ๐ฟ ๐๐ต๐ผ๐๐น๐ฑ ๐ฏ๐ฒ ๐๐ต๐ฒ ๐๐ต๐ฒ๐น๐ณ ๐ป๐๐บ๐ฏ๐ฒ๐ฟ. ๐ก๐ผ๐๐ต๐ถ๐ป๐ด ๐น๐ฒ๐๐ ๐ฐ๐ผ๐๐ป๐๐.
๐
๐๐๐ ๐๐๐๐ ๐๐: โ๐ก๐ก๐๐ ://๐ค๐ค๐ค.๐๐๐๐๐ก๐๐๐๐.๐๐๐.๐๐ฆ/๐ ๐๐๐๐ก-๐ค๐๐๐โ๐๐ข๐ ๐-๐๐๐ก๐๐๐๐๐ /
16/07/2026
๐๐ฟ๐ฎ๐๐ฒ๐ณ๐๐น ๐๐ผ ๐ต๐ผ๐๐ ๐๐ต๐ฒ ๐๐ฒ๐ฎ๐บ ๐ณ๐ฟ๐ผ๐บ ๐ ๐๐ง๐ ๐ฎ๐ ๐ผ๐๐ฟ ๐ฆ๐ต๐ฎ๐ต ๐๐น๐ฎ๐บ ๐๐ค ๐ณ๐ฎ๐ฐ๐ถ๐น๐ถ๐๐.
Thank you for taking the time to see our work up close. It means a lot to walk visitors through what we build and why it matters for ๐ ๐ฎ๐น๐ฎ๐๐๐ถ๐ฎ๐ป ๐บ๐ฎ๐ป๐๐ณ๐ฎ๐ฐ๐๐๐ฟ๐ถ๐ป๐ด.
Conversations like these keep us focused on solving real problems on the factory floor. We're proud to be doing this from Malaysia, and we're just getting started.
Terima kasih, Ministry of Investment, Trade and Industry, Malaysia ๐ฅฐ
Click here to claim your Sponsored Listing.
Category
Contact the business
Address
3, Jalan Sepadu 25/123A Taman Perindustrian Axis, Seksyen 25
Shah Alam
40400
Opening Hours
| Monday | 08:30 - 17:30 |
| Tuesday | 08:30 - 17:30 |
| Wednesday | 08:30 - 17:30 |
| Thursday | 08:30 - 17:30 |
| Friday | 08:30 - 17:30 |
Alerts
Be the first to know and let us send you an email when Codetrace posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.