AllDone Construction

AllDone Construction

Share

AllDone Construction is a residential and commercial roofing contractor based in Austin, TX.

09/23/2026

09/22/2026

Bringing Older Homes to Modern Code: What Triggers Full Compliance

Owning or remodeling an older home doesn’t automatically require you to bring every single system up to today’s building code—but certain types of work will. Knowing when the law requires full compliance helps you budget, plan, and avoid surprises during construction.

Why This Matters
Modern codes improve safety, efficiency, and durability
Full compliance can significantly increase project scope and cost
Some triggers are based on project type, percentage of structure altered, or specific hazards addressed

Common Triggers for Full Code Compliance
Major Structural Changes

Removing or altering load-bearing walls
Adding a second story or large addition
Rebuilding framing after fire, flood, or severe damage

Extensive Renovations

Projects affecting more than a set percentage of floor area (often 50%+, varies by jurisdiction)
Gutting rooms to studs, especially kitchens and bathrooms

System Replacements

Full electrical rewire or main panel upgrade
Complete plumbing replacement or relocation
Full HVAC replacement with ductwork changes

Hazard or Safety Upgrades

Work involving unsafe electrical, structural, or fire-safety conditions
Code officials can require correction of unrelated hazards discovered during inspection

Examples of Triggered Upgrades
Kitchen gut remodel → GFCI/AFCI breakers, dedicated appliance circuits, modern ventilation
Bathroom remodel down to studs → Moisture-rated electrical, modern venting, upgraded plumbing sizing
Roof replacement on older home → Ice & water shield in required zones, modern nailing patterns, venting upgrades

Best Practices
Consult with your contractor before starting—know your jurisdiction’s thresholds
Factor compliance-triggered upgrades into your budget early
Pull permits properly to avoid fines and rework
Use the opportunity to improve safety, efficiency, and resale value

09/21/2026

"Myth: Construction starts the day after you sign."

Fact: Construction often involves planning, permits, scheduling, and prep work before breaking ground. Immediate start is rare—patience and planning ensure a smoother project.

09/19/2026
09/18/2026

Why can't I just use household fans?

Household fans are not designed to create the controlled drying environment needed after significant water damage. Professional equipment provides the airflow and moisture removal necessary to achieve proper drying.

09/15/2026

Load Transfers When Moving or Removing Interior Walls
Not all interior walls are just “room dividers.” Many carry structural loads from floors, roofs, or other walls above—and altering them without proper planning can lead to sagging, cracking, or even structural failure. Understanding load transfer is essential when moving or removing walls during remodels.

What Load Transfer Means
Vertical Loads: The weight from roof framing, upper floors, or heavy finishes passing down through walls into the foundation
Lateral Loads: Forces from wind or seismic events that certain walls help resist
Point Loads: Concentrated loads from beams or trusses that require proper support beneath them

Determining if a Wall is Load-Bearing
Check Framing Direction: Walls running perpendicular to joists are more likely to carry load
Inspect the Attic or Basement: See if beams, joists, or trusses terminate on the wall
Review Building Plans: Look for engineering details identifying load-bearing members
Consult a Structural Engineer: Essential for confirmation before demolition

How Loads Are Transferred When a Wall Is Removed
Temporary Shoring: Supports loads during demolition
Header or Beam Installation: Transfers loads horizontally to posts at each end
Post-to-Foundation Connection: Posts transfer loads down to a footing or pier capable of supporting them
Load Path Continuity: Ensures weight is carried all the way to the ground without weak points

Common Mistakes
Assuming all interior walls are non-load-bearing
Using undersized beams or posts
Failing to provide adequate bearing at beam ends
Interrupting the load path with unsupported spans or inadequate footings

Best Practices
Always get a structural analysis before altering walls
Use engineered beams sized for the actual load (LVL, steel, or glulam as required)
Ensure posts are aligned with load-carrying members below—never just on subfloor
Coordinate with building inspectors for compliance and approval

Risks of Skipping Proper Load Transfer Planning
Ceiling sag or floor deflection
Wall cracks and door misalignment
Structural instability or collapse
Costly emergency repairs after the fact

09/14/2026

"Myth: Verbal agreements are good enough."

Fact: Verbal agreements lack legal enforceability and can lead to misunderstandings. Written contracts provide clear terms and protect everyone involved. Always get it in writing!

09/11/2026

Can hardwood floors be dried?

Many hardwood floors can be saved if mitigation begins quickly and proper drying methods are used. Specialized drying systems can often remove moisture without requiring full replacement.

Want your business to be the top-listed Home Improvement Business in Austin?
Click here to claim your Sponsored Listing.

Telephone

Address


7600 Chevy Chase Drive, Suite 300
Austin, TX
78752