Civil Engineering and Construction Explained

Civil Engineering and Construction Explained

Share

Your probably wondering why your pavements doing well compared to others. Why all that black fence, why are they painting the ground green.

Why this construction taking so long?

03/10/2026

Most people donโ€™t realize geotextile does this.

Watch the water.

Instead of going straight through the fabric, the non-woven geotextile actually pulls the water sideways through the fibers.

Thatโ€™s capillary wicking inside the fabric.

Engineering materials often do a lot more than people think.

03/06/2026

๐—ช๐—ต๐—ฎ๐˜ ๐—ฑ๐—ผ๐—ฒ๐˜€ ๐—ฎ ๐—ณ๐—ฎ๐—ถ๐—น๐—ฒ๐—ฑ ๐—ฝ๐—ฟ๐—ผ๐—ผ๐—ณ ๐—ฟ๐—ผ๐—น๐—น ๐—ฎ๐—ฐ๐˜๐˜‚๐—ฎ๐—น๐—น๐˜† ๐—น๐—ผ๐—ผ๐—ธ ๐—น๐—ถ๐—ธ๐—ฒ?

This video shows it in real time.
Watch the truck tires.

๐—™๐—ถ๐—ฟ๐˜€๐˜ ๐˜€๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป: Aggregate placed over geogrid.
The truck advances and the aggregate barely moves.

๐—ฆ๐—ฒ๐—ฐ๐—ผ๐—ป๐—ฑ ๐˜€๐—ฒ๐—ฐ๐˜๐—ถ๐—ผ๐—ป: Same aggregate thickness.
๐—ก๐—ผ ๐—ด๐—ฒ๐—ผ๐—ด๐—ฟ๐—ถ๐—ฑ.

Now the wheels begin exposing the weak subgrade below.
Thatโ€™s exactly what a proof roll is designed to reveal.
But hereโ€™s the important part.

When subgrade fails a proof roll, the old solutions were:

โ€ข Over-excavate
โ€ข Import new fill
โ€ข Disc and dry the soil
โ€ข Bring in more equipment

All of which slow the project down.

Today thereโ€™s a faster approach.

Run a quick DCP test to measure the subgrade strength.
Use that data to calculate the required aggregate thickness.
Then install geogrid + the designed aggregate section.

The geogrid stabilizes the aggregate layer and distributes loads so the section can bridge weaker soils and move forward with construction.

No major excavation.
No waiting for soil to dry.
No extra equipment cycles.

Sometimes the fastest solution is simply designing the section correctly.

๐—›๐—ฎ๐˜ƒ๐—ฒ ๐˜†๐—ผ๐˜‚ ๐˜€๐—ฒ๐—ฒ๐—ป ๐—ฝ๐—ฟ๐—ผ๐—ผ๐—ณ ๐—ฟ๐—ผ๐—น๐—น ๐—ณ๐—ฎ๐—ถ๐—น๐˜‚๐—ฟ๐—ฒ๐˜€ ๐—น๐—ถ๐—ธ๐—ฒ ๐˜๐—ต๐—ถ๐˜€ ๐—ผ๐—ป ๐˜†๐—ผ๐˜‚๐—ฟ ๐—ฝ๐—ฟ๐—ผ๐—ท๐—ฒ๐—ฐ๐˜๐˜€?

02/26/2026

They are lifting a 3' x 7' piece of asphalt, this is not possible with a standard asphalt mix. This asphalt has fibers added to it. It makes asphalt last up to 50% longer. NO more potholes?

01/07/2026

Relaxing just to watch the dozer going back and forth.

Want your business to be the top-listed Hardware Service in Des Moines?
Click here to claim your Sponsored Listing.

Telephone

Address

220 New York Avenue
Des Moines, IA
50313

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm