LINQX

LINQX

Share

Welcome to the official LINQX Facebook channel—your go‑to source for digital transformation in oil & gas.

We use AI, advanced analytics, and decades of expertise to revolutionize well construction—from design and drilling through cementing & fracture. Welcome to the official LINQX facebook—your go‑to source for digital transformation in the oil and gas industry. We leverage AI, advanced data analytics, and decades of expertise to revolutionize well construction and stimulation—from design and drilling through cementing, fracture logging, and production optimization.

What Machine Learning Could Mean for the Future of Cementing Engineering - LINQX 09/24/2026

What happens when engineering expertise meets machine learning?

Cement displacement involves a complex combination of fluid properties, pumping conditions, pipe movement, and well geometry.

Our latest LINQX blog looks at how machine learning could help engineers better understand those relationships—and what that could mean for the future of digital cementing.

Read the blog: https://na2.hubs.ly/H07-Y_M0

What Machine Learning Could Mean for the Future of Cementing Engineering - LINQX Machine learning is becoming increasingly common across oil and gas, but the more important question is not whether the industry can apply machine learning. It is where it can actually add engineering value. Cementing is one area where that question is particularly relevant. Displacement efficiency....

09/22/2026

What can machine learning tell us about cement displacement?

Our latest research, authored by Hu Dai, Ph.D. and Zhibin Sun, takes a closer look at how machine learning can help predict the displacement efficiency of non-Newtonian fluids in vertical and inclined pipes.

Now published online and coming in the December 2026 issue, the study uses experimental data and an XGBoost model to examine the influence of pumping velocity, pipe rotation, fluid density, viscosity, and other parameters.

It’s another look at how data-driven approaches can complement engineering expertise and support better decisions in challenging cementing applications.

Read the full paper:https://na2.hubs.ly/H07X1Bv0

Photos from LINQX's post 09/17/2026

Final day at Super DUG!

We’re wrapping up three days of conversations around the technology, data, and engineering solutions helping oil & gas teams keep operations moving.

If you’re at the George R. Brown Convention Center, stop by Booth 212 to connect with the team and see how we alongside LogistixIQ bring digital solutions and engineering expertise together—from planning and design to field operations.

Can’t make it by the booth? [email protected]

Photos from LINQX's post 09/15/2026

We’re here! 👋 Super DUG 2026 is officially underway in Houston.

The team is on the ground at the George R. Brown Convention Center, connecting with industry professionals and talking technology, engineering, data, and the future of oil & gas operations.

Today, Gigi Zhang, Unce Rehman, and Chris Cameron from LogistixIQ are at the show and ready to connect.

📍 Find us at Booth 212

At Super DUG today? Stop by and say hello!

Not at the show? Connect with our team at [email protected].

09/14/2026

Super DUG starts tomorrow!

Join us at Super DUG 2026 in Houston, September 15–17, where our team will be showcasing how connected digital solutions can support the work happening across the well and in the field. We’ll also be joined by LogistixIQ, our transportation management solution for oil & gas, helping teams eliminate NPT, control freight costs, and simplify bulk logistics.

📅 September 15–17, 2026
📍 Houston, TX
🎟️ Booth 212

If you’re attending Super DUG, stop by Booth 212 to connect with our team!

09/08/2026

📍 Heading to DUG 2026? Come see LINQX at Booth 212.

From September 15–17, we’ll be at the George R. Brown Convention Center in Houston connecting with oil & gas professionals and showcasing technologies built to support better decisions across well construction and stimulation. Stop by Booth 212 to meet our team and explore what LINQX is bringing to the next generation of well operations.

📅 September 15–17, 2026
📍 George R. Brown Convention Center | Houston, TX
🔹 Booth 212

See you at DUG 2026!

09/04/2026

Happy Labor Day from LINQX!

Today, we honor the hard work, dedication, and contributions of workers across the U.S. who keep our communities and industries moving forward.

Wishing our customers, partners, and colleagues a safe and happy Labor Day.

09/02/2026

How accurately can you predict cement temperature during a plug job?

Temperature prediction can play an important role in plug cementing design, but conditions can change significantly during mud displacement and pipe pull-out.

Our latest blog explores an advanced numerical model that captures transient temperature changes across the full well depth.

Through detailed case studies, discover how pipe diameter, fluid viscosity, well inclination, pulling velocity, and placement method can affect cement temperature—and what these findings mean for optimizing plug cementing strategies.

Read the full analysis and explore the key findings 👉https://na2.hubs.ly/H07Bn5G0

08/26/2026

Something worth joining is taking shape.

The LINQX community on Collide is coming soon — a new space for our network to connect, share what we know, ask questions, and discover what others across oil & gas are working on.

Want to be part of it from the beginning? Join the waitlist → https://na2.hubs.ly/H07s0l00

When the community opens, you’ll be able to:

→ Exchange ideas with industry peers
→ Learn from experienced professionals
→ Share experiences and insights
→ Build meaningful connections across oil & gas

Get in early. Join the waitlist!

08/24/2026

One day to go. ⏳

What if you could see a cementing risk before it becomes NPT?

Tomorrow, see how CEMPRO Live helps engineers monitor real-time data, spot changes early, and respond before issues escalate.

→ Real-time KPI monitoring
→ Configurable alerts
→ Faster, more informed decisions

Join us tomorrow — reserve your spot: https://na2.hubs.ly/H07nRQH0

Want your business to be the top-listed Equipment Service in Houston?
Click here to claim your Sponsored Listing.

Telephone

Address


2050 W Sam Houston Parkway S, Suite 1750
Houston, TX
77042

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm

Alerts

Be the first to know and let us send you an email when LINQX posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Subscribe

We will notify you when anything happens in Houston.