Advanced Planning Analytics
Authorized Oracle Certified Training & Software Provider Authorized Provider of Oracle Certified Training and Software
Data center projects move fast—and the schedule must keep pace.
Learn how to build and manage a logic-driven data center construction schedule using Primavera P6, from site preparation through commissioning.
Register: https://www.advancedplanninganalytics.com/p6-sign-up.html
Project controls training should meet you where you are—not force you into a one-size-fits-all course.
My one-on-one Primavera P6 and Earned Value Management training is customized around your experience, questions, and professional goals. Whether you’re learning the fundamentals, strengthening your scheduling skills, or applying EVM concepts such as CPI, SPI, EAC, and forecasting, we’ll focus on practical techniques you can use on real projects.
- Personalized instruction
- Practical exercises and real-world examples
- P6 scheduling and project controls
- EVM performance measurement and forecasting
Register or request additional information:
https://www.advancedplanninganalytics.com/p6-sign-up.html
08/19/2026
Earned Value Management is best understood when you work through the story behind the numbers.
During this recent EVM 101 course, we moved beyond memorizing formulas and used a practical project exercise to connect scope, schedule, cost, progress, and forecasting. By the end, the students could see how EVM helps answer the questions every project team needs to understand:
Are we truly on budget?
Are we progressing as planned?
What is the project likely to cost at completion?
I’ll be offering additional instructor-led EVM courses for project controls professionals, schedulers, cost engineers, project managers, and anyone ready to build a practical understanding of earned value.
Interested in attending an upcoming course or arranging private training for your organization?
Register Here:
https://www.advancedplanninganalytics.com/p6-advanced-evm.html
08/18/2026
📊 Learn Primavera P6 the way it’s used on real projects.
Our Primavera P6 Scheduling Training goes beyond software basics. Learn practical planning, CPM scheduling, logic development, progress updates, and project controls techniques used across Data Centers, EPC, Oil & Gas, and industrial projects.
Whether you're building your P6 skills or looking to move into a scheduling role, this course is designed around real-world application — not just theory.
📅 Register today or DM me for upcoming course dates. Also check calendar dates on th website.
https://www.advancedplanninganalytics.com/p6-sign-up.html
What Project Controls Boot Camp Does Houston Need?
I'm putting together my upcoming Houston Project Controls Boot Camp calendar — Primavera P6, EVM, Schedule Risk, Forensic Scheduling, TIA, Acumen Fuse, and AI/Power BI applications for project controls.
Rather than guessing what people want, I put together a quick 60-second survey.
If you're a scheduler, project-controls professional, PM, cost engineer, or project leader in the Houston area, I'd appreciate your input.
Takes about a minute: https://forms.gle/stAq2btVPAkbfCfx6
07/31/2026
One year ago, AI failed.
I published a video showing my attempt to teach AI how to generate a Primavera P6 XER file. The concept worked... but the XER didn't.
Primavera P6's XER format turned out to be far more complex than expected, with undocumented rules, strict table relationships, and import requirements that AI simply couldn't figure out on its own.
Instead of giving up, I spent the next year reverse engineering the XER format, testing dozens of schedules, identifying import rules, and iteratively teaching AI what Primavera actually expects.
Today, things have changed.
🎥 The Revenge of AI: We Finally Built a Working Primavera P6 XER
In this video, I compare where we started, what went wrong, what we learned, and demonstrate AI successfully generating a Primavera P6 XER that imports into P6.
This wasn't about replacing schedulers—it was about understanding the file format deeply enough to use AI as a development partner.
I think this is a glimpse into where project controls is heading. AI won't replace experienced planners and schedulers, but those who learn to leverage AI effectively will gain a significant advantage.
I'd love to hear your thoughts. Have you experimented with AI in Primavera P6, scheduling, or project controls?
https://youtu.be/-Qf8soY7qt8?si=DqxyyqpKNmBYFjUq
07/09/2026
🚀 Expand Your Primavera P6 library with professionally developed XER Templates.
Whether you're building a schedule from scratch, training new planners, creating proposals, or looking for a proven starting point, these ready-to-import Primavera P6 XERs can save hours—if not days—of schedule development.
Available templates include:
✅ Data Centers
✅ Onshore Drilling
✅ Onshore EPC
✅ Offshore EPC
✅ EPC Onshore Mini
Each template includes:
• Fully developed CPM logic
• Industry-standard WBS
• Resource-ready activity structure
• Multiple P6 layouts (WBS, 2-Week Lookahead, 4-Week Lookahead, 3-Month Lookahead, Longest Path, and Multiple Float Path)
• Instant digital download
These aren't generic examples—they're practical schedules built from real project controls experience and designed to give schedulers, project managers, and project controls professionals a head start.
Browse the full collection and download today:
https://www.advancedplanninganalytics.com/xer-p6-templates.html
07/08/2026
🚀 New Release – Data Center Primavera P6 XER Template
Over the past several months I've been developing a library of Primavera P6 schedule templates designed to help project controls professionals build quality schedules faster.
I'm excited to release the first one:
Data Center Primavera P6 XER Template
✅ 372 professionally developed activities
✅ Logic-linked schedule
✅ Structured WBS
✅ Ready for Primavera P6 import
✅ Fully editable
BONUS: Includes 6 professional Primavera P6 layouts
• WBS Layout
• 2-Week Lookahead
• 4-Week Lookahead
• 3-Month Lookahead
• Longest Path Layout
• Multiple Float Path Layout
Whether you're developing a proposal schedule, owner's schedule, contractor baseline, or simply looking for a solid starting point, this template can save hours of schedule development while following proven project controls practices.
This is just the beginning.
I'm also developing a much larger enterprise-level Data Center schedule with approximately 3,000–5,000 activities for teams needing a highly detailed ex*****on schedule.
I'd love your feedback on what other industries you'd like to see next:
• LNG
• Pipelines
• Chemical Plants
• Power Generation
• Manufacturing
• Turnarounds
Available now through the APA Store.
https://www.advancedplanninganalytics.com/store/p100/XER-Data-Center-P6-Template.html
03/11/2026
One thing I’ve noticed after years in EPC projects:
Time & Materials contracts often create two completely different perceptions of reality.
Contractor perspective:
“Just document the work and bill what it took.”
Owner perspective:
“Where did the hours go and how do we control the cost?”
Neither side is necessarily wrong… but the gap in perception is real.
Which cartoon captures your experience better?
👇 Contractor view
👇 Owner view
Let’s see where the industry lands.
03/10/2026
What’s the hardest part of building a turnaround schedule?
• Thousands of short-duration activities
• Craft coordination and congestion
• Sequencing work in tight windows
• Constant field changes
Turnarounds move fast, and the schedule has to keep up.
That’s why I wrote Turnaround Scheduling Simplified — a practical guide to building schedules that actually work during shutdowns.
https://a.co/d/05rSryuz
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
Houston, TX
Alerts
Be the first to know and let us send you an email when Advanced Planning Analytics posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.