Dextall
Tech Enabled | Labor Smart | Green Forward Dextall prefab process eliminates Jobsite labor availability impact. Why is that important?
Dextall Prefab Walls
Dextall Tech Forward methods are fundamentally changing how we design and build new generation prefab walls for mid and high-rise building exteriors. Dextall is a leading system designer and fabricator of prefab exterior wall panel systems for mid/high rise buildings. We integrate digital tools to optimize design processes that eliminate 24 months of unnecessary coordination, provides exact exterior cost at the earliest design stages. Our factory assembled exterior walls are installed like building blocks with factory sealed windows and cladding providing superior quality and has a direct impact in reducing the carbon footprint of the buildings where our system is used. Building exteriors with Dextall panels is 75% faster compared to onsite construction processes. By using the dry gasket method
there is no need to go back outside and seal the panels once they are set in place; thus no scaffolds or other suspended platforms. There is an urgent need to change the way the commercial construction industry operates
The construction industry in particular mid and high-rise buildings construction processes have not changed for the last 100 years. The current design and construction process of building exteriors requires intense coordination involving multiple stakeholders that can easily last 2 years. It’s a waste of time and capital. The current onsite construction process is lengthy, inefficient, contributes to poor overall building quality, and is not sustainable – 30% of building materials become waste once they get to the Jobsite. Buildings are vital to our environment and they are one of the largest contributors to our carbon footprint on this planet. Even the smallest gains in energy efficiency at scale have a massive impact. Improved processes will lead to overall cost savings and will contribute to more housing opportunities for communities in need.
09/28/2026
Last Week during UN Week, Lithuania and New York sat down to talk about energy security and climate goals, and Dextall was part of it.
Our CEO Aurimas attended the Presidential Business Forum on Resilience at the Union League Club, where President Gitanas Nausėda gave the keynote. He then joined Lukas Savickas, Lithuania's Minister of Energy, and Nick Ng of The Clean Fight on stage at the Consulate General of Lithuania in New York. They spoke about New York's 2050 climate goals, which can't be met without faster, lower-carbon construction. That is what our prefab façades deliver.
Thank you to the Consulate General of Lithuania in New York, the Baltic American Chamber of Commerce, the American Lithuanian Business Council and The Clean Fight.
09/15/2026
🏃♂️🏃♀️ 10K completed at the Vilnius Marathon!
A big congratulations to six members of the Dextall team who took on the Vilnius Marathon 10K together.
Great energy, an incredible atmosphere, plenty of smiles, and 10 kilometers that somehow seemed to fly by. Most importantly, it was another chance to spend time together outside the office and prove that teamwork looks just as good on the running course.
Well done to everyone who crossed the finish line! 💪
Next year, we would love to see an even bigger Dextall team at the start.
Who is joining us for the next one? 🏃♀️🏃♂️
lafia has officially topped out in Brooklyn.
The final floor is in, the façade is taking shape, and this 14 story high performance project is getting very close to the finish line.
Our latest video gives a look at Alafia Phase 2 today and shows just how far the project has come.
Watch the video and stay tuned. The finished building is coming soon.
09/08/2026
The first look is here.
The visual mockup for Innovation Queens B1 is complete, bringing the façade design, materials, and custom aluminum cladding into view.
Take a closer look at what will help shape this 27 story Astoria development.
09/02/2026
Facade design has run on the same timeline for decades: roughly three years from concept to installed panel. Our founder just explained, on record, how that number becomes one week and what breaks when it does.
On the newest episode of AEC Tech Journeys, host Mayur Mistry talks with Dextall Founder & CEO Aurimas Sabulis about the physics and the politics of that compression: prefabricated exterior wall systems paired with purpose-built design software, and why the biggest obstacle was never engineering : it was convincing an entire supply chain to trust a process it couldn't watch happen on-site.
Full conversation: https://www.youtube.com/watch?v=RUWlD4D_zO8
From 3 Years to 1 Week in Facade Design: Aurimas Sabulis of Dextall In this episode, Aurimas Sabulis, founder and CEO of Dextall, expla...
345 McLean has officially topped out in Yonkers.
Our latest video captures the milestone and shares a closer look at the project details behind this 12 story, 105 unit affordable housing development.
From DWall 1500 panel production to installation on site, this project shows how prefabricated façade systems can help move construction forward with speed, quality, and predictability.
A big moment for the building, and a great look at prefab progress in action.
Watch the video to see 345 McLean reach the top.
If you're evaluating facade systems for your next project, here's a data point worth knowing. Dextall's DWALL just passed its 5th performance mockup at 22 Fulton, a rigorous 13 step test covering everything from vent operation to structural overload.
The result? No uncontrolled leakage, no failures, and structural performance up to 88.5 psf, well above the 59 psf design load.
Numbers like these are why owners and GCs keep choosing DWALL.
345 McLean has topped out, and we are continuing the conversation from the jobsite.
In our latest video, Martin Logue, Superintendent from Sisca Organization, joins us in front of the building to share his perspective on the project, the installation process, and what it was like seeing Dextall’s prefabricated façade system come together on site.
This 12 story, 105 unit affordable housing project in Yonkers continues to show how prefab can support speed, coordination, and reliable ex*****on in the field.
Watch the video to hear Martin’s feedback and see the progress at 345 McLean.
Something bigger is taking shape.
Our newest production floor adds 84,000 sq ft of space and brings Dextall’s combined capacity across all facilities to 600,000 sq ft under roof.
We are not ready to say what this space will produce just yet, but this first look says a lot.
Watch the teaser and stay tuned.
Click here to claim your Sponsored Listing.
Category
Website
Address
Newark, NJ
07101-07108, 07112, 07114