Kitchen update- countertops were installed today. The video doesn’t do them justice.
06/09/2026
Might be my first and last drop ceiling install.
Project update- cabinets were all up but had a little problem with the refrigerator size. Doors would t open fully. Had to switch to a panel ready refrigerator and new cabinets around the fridge. Love how the cold air vent delete turned out. Such a better look.
05/21/2026
Little side project for a buddy
Update video- just about all the demo is done, I just have the sink let to remove. Stairs are all ready for trim Friday. Drywall hanger and finishers were here today they should be done in a couple of days. Then flooomg next week.
04/09/2026
Stair demo begins.