19/08/2026

To all South Africa Solar Power users

Original post - https://www.facebook.com/share/1Hxyxir35W/

Good news for South Africans with solar panels on their roofs
Declan Thompson • 13 August 2026
South Africans who do not register their rooftop solar power systems with Eskom will not be issued fines or have their electricity supply disrupted.
The deadline for South Africans to register their small-scale embedded generation (SSEG) systems with Eskom and have their fees waived is 30 September 2026.
Media reports previously suggested that South Africans who failed to register before this date could face fines ranging from R6,000 to R30,000, depending on the municipality.
However, Eskom spokesperson Daphne Mokwena has reportedly confirmed that the power utility will not impose fines or cut off electricity supply to customers who fail to register before this date.
In a social media post, energy expert Chris Yelland said Mokwena personally confirmed this to him and the Organisation Undoing Tax Abuse (OUTA).
This followed both Mokwena and Yelland appeared on Power Breakfast,
during which Yelland said Eskom did not possess the right to issue fines in the first place.
“It is not a court,” Yelland said. “It is not a statutory authority, it doesn’t write the law, and there is no provision for Eskom to issue fines.”
“We believe that cutoffs are an empty threat. They have no basis in law, and they will be challenged if they do start cutting off people who have not registered their solar systems.”
Eskom previously called for all systems under 100 kW to be registered under Schedule 2 of the Electricity Regulation Act, regardless of whether they feed back into the electricity grid.
Yelland and OUTA have argued, however, that systems under 100 kW do not need to be registered with Eskom or the National Energy Regulator of South Africa (NERSA).
According to Yelland, the Act does not apply to electrical installations which are behind the meter or do not have a point of connection to the municipal grid, which includes all solar systems.
“The Electricity Regulation Act states very clearly the conditions by which a distributor may disconnect a customer,” Yelland explained.
“If you read it carefully, you’ll find that failing to register your systems is not one of those reasons in law that entitle Eskom to cut you off.”
The real reason behind the registrations

Eskom has said on multiple occasions that safety and the stability of its grid are the primary reasons behind the solar registration requirement.
Mokwena explained that the utility needed to ensure that all electricity installations which are connected to its grid met certain safety requirements, including solar systems.
This, she said, would ensure the safety and reliability of both the electricity users at home, as well as on Eskom’s distribution network.
Additionally, she explained that the solar registrations were an important way for Eskom and NERSA to accurately quantify the number of solar users in South Africa.
Yelland rebuked both reasons as disingenuous and said they were misleading South Africans away from the true motives behind the registrations.
“The suggestion that solar PV systems cause safety issues on the utility side of the meter is simply not true,” Yelland said. “Eskom and municipalities have detailed procedures for working on their network.”
“This includes measuring if there is voltage present, isolating, locking out, and earthing. If you follow those procedures, you do not have safety problems at all.”
Yelland explained that all electricity systems which hold a Certificate of Compliance, which is required by law, are safe and compliant.
Additionally, he described the argument that solar registrations are required for Eskom to know how many solar users there are in South Africa as “absolute nonsense”.
Yelland pointed out that Eskom already knows how much solar PV there is in the country because it publishes this information publicly on its website every week.
Since most of these solar installations remain unregistered, Yelland said that Eskom’s use of registrations as an indicator of the amount of solar in the country would be inaccurate.
Instead, Yelland argued that the solar registrations served as a means for Eskom to generate more revenue through forcing its customers to switch to more expensive monthly electricity tariffs.
“Eskom customers on the Homelight tariff that have prepaid meters, which comprises a vast majority of Eskom’s direct customers, do not pay a fixed monthly cost,” Yelland said. “They only pay an energy usage cost.”
“The moment you want to install a solar PV system and register that system, you are converted off the Homelight tariff onto the Homeflex tariff, which has a very significant fixed monthly cost.”

Photos from Blue Ladder Projects Pty Ltd's post 04/08/2026

Our team has successfully completed 2x residential paving painting projects

Contact Jaco Botha 081 863 6998 or Ockie 083 637 2891

Photos from Blue Ladder Projects Pty Ltd's post 29/07/2026
Photos from Blue Ladder Projects Pty Ltd's post 29/07/2026

Supply, Install & Commision 20kW Deye inverter 3x 15kWh Deye L/Batteries, 24x 550W Solar Panels. For inquiries, get in touch with Jaco Botha at 0818636998 / 0637610333. WhatsApp https://wa.link/95jjfv. Website: https://qew-projects.co.za/

Plus, enjoy peace of mind with our ●2 Year Workmanship Warranty & ●ECA(SA) Workmanship guarantee. Read more on ECA(SA) website: https://ecasa.co.za/technical/the-ecasa-guarantees-members-workmanship/.

Photos from Blue Ladder Projects Pty Ltd's post 27/07/2026

Swartruggens - Rooftop Respray. Contact Jaco Botha 0818636998.

23/03/2026

Phokeng: Solar Lighting Installation Services - Contact Jaco on 0818636998.

Photos from Blue Ladder Projects Pty Ltd's post 23/03/2026

Bathroom renovation experts - Contact Jaco 0818636998 for a 2-year workmanship warranty.

Photos from Blue Ladder Projects Pty Ltd's post 23/03/2026

Reliable Electrical Services - Wynand: 0637610333. As a registered ECA(SA) electrician, I offer 33 years of experience in residential, industrial, commercial, and mining electrical solutions. 2-year workmanship warranty and ECA(SA) guarantee. Cable Jointing N4 Bakwena Highway.

10/12/2025

Royal Bafokeng Stadium High Mast Lights fault finding & Globe Replacement. 104 - 106 globes x4 poles. For inquiries, get in touch with Jaco Botha at 0818636998 / 0637610333. WhatsApp https://wa.link/95jjfv. Website - https://qew-projects.co.za/

Plus, enjoy peace of mind with our ●2 Year Workmanship Warranty & ●ECA(SA) Workmanship guarantee. Read more on ECA(SA) website: https://ecasa.co.za/technical/the-ecasa-guarantees-members-workmanship/.

Photos from Blue Ladder Projects Pty Ltd's post 03/12/2025

N4 Bakwena Rustenburg Mall Offramp - 11kVA HT Jointing. For inquiries, get in touch with Jaco Botha at 0818636998/0637610333.

WhatsApp: https://wa.link/95jjfv

We're proud to be registered with ●CIPC●ECA(SA)●COIDA●DOL●NBCEI(SA). Plus, enjoy peace of mind with a 2-year workmanship warranty ●ECA(SA) Workmanship guarantee. Read more: https://ecasa.co.za/technical/the-ecasa-guarantees-members-workmanship/

Want your business to be the top-listed Engineering Company in Rustenburg?
Click here to claim your Sponsored Listing.

Website

Address


Rustenburg
0300